Drill test wrapup
Jul. 28th, 2005 09:19 am![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
On Monday we took down the drill site camp, packed away the equipment, and on Tuesday the other team members left. Yesterday the two large crates from Honeybee departed on the same Twin Otter that brought in the spacesuit.
Here's the full drill setup, in operation:

And a crew from a Discovery Channel documentary, filming it:

Here's the red ATV that is part of the Ames motorpool, which I often use:

A view of the Trinity Lake breccia drilling site, in use:

Since the Humvee had gotten stuck in the mud previously, it was rolled downhill to a drier area, and we ferried the drill and other equipment over to it on ATVs:

Here's the full drill setup, in operation:

And a crew from a Discovery Channel documentary, filming it:

Here's the red ATV that is part of the Ames motorpool, which I often use:

A view of the Trinity Lake breccia drilling site, in use:

Since the Humvee had gotten stuck in the mud previously, it was rolled downhill to a drier area, and we ferried the drill and other equipment over to it on ATVs:
