jay: (Default)
[personal profile] jay


Last one out

Friday lunchtime, we pulled our equipment out of the drillsite camp and took it to the runway. KZ took this photo as we left the drillsite.
Last one out
Post-drill dance

Cossacks? Well, a Pole and an Italian... doing a dance on either side of the drill, after we'd powered down Friday morning (after the reporter left).
Post-drill dance
Rainbow conclusion

A group shot taken at the end of the drilling tests, after midnight early Friday, had an appropriate backdrop. :)
Rainbow conclusion
Icy core

We reached a final depth of 3.22m. Here's the last core taken out, full of ice. We lost time on Tuesday and Wednesday trying to use a non-coring bit.
Icy core
Ground truth hole

Originally dug for sandbags for ballast, we used this hole to drill with commercial high-powered equipment to get an idea of what the DAME drill was likely hitting nearby. Note the slumping due to permafrost melting, under the previous active-layer boundary.
Ground truth hole
Repeater duty

It was usually my job to refill and maintain the communications repeater on Haynes Ridge that kept us in touch with base camp and the outside world. Here's my ATV viewed from the repeater, one foggy evening.
Repeater duty

Date: 2006-08-01 06:45 am (UTC)
From: [identity profile] brian1789.livejournal.com
Thanks! Although there were only 6/8 of us in the photo (Sathya and [personal profile] dangerpudding were both back in camp).

May 2009

S M T W T F S
     12
3 456789
10111213141516
17181920212223
24252627282930
31      

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jan. 20th, 2026 11:02 pm
Powered by Dreamwidth Studios